Luxury Apartments & Flats Developers In Nagpur, India
Vasundara Enclave  Apartment

 Welcome to Concrete Developers new project Vasundara Enclave with a 14th story appartment situated in the middle of the city, At At C.T.S. no. 504, Narendra Nagar, Nagpur







View Vasundhara Enclave in a larger map


FLOOR PLAN1
 

FLOOR PLAN1
FLOOR PLAN2
 

FLOOR PLAN2
FLOOR PLAN3
 

FLOOR PLAN3
FLOOR PLAN4
 

FLOOR PLAN4
FLOOR PLAN5
 

FLOOR PLAN5
FLOOR PLAN6
 

FLOOR PLAN6
FLOOR PLAN7
 

FLOOR PLAN7
FLOOR PLAN8
 

FLOOR PLAN8
FLOOR PLAN9
 

FLOOR PLAN9
FLOOR PLAN10
 

FLOOR PLAN10
FLOOR PLAN11
 

FLOOR PLAN11
FLOOR PLAN12
 

FLOOR PLAN12
FLOOR PLAN13
 

FLOOR PLAN13
FLOOR PLAN14
 

FLOOR PLAN14
FLOOR PLAN15
 

FLOOR PLAN15
FLOOR PLAN16
 

FLOOR PLAN16
FLOOR PLAN17
 

FLOOR PLAN17
FLOOR PLAN18
 

FLOOR PLAN18
FLOOR PLAN19
 

FLOOR PLAN19
FLOOR PLAN20
 

FLOOR PLAN20
FLOOR PLAN21
 

FLOOR PLAN21
FLOOR PLAN22
 

FLOOR PLAN22
FLOOR PLAN23
 

FLOOR PLAN23
FLOOR PLAN24
 

FLOOR PLAN24

 


 

( SPECIFICATIONS)

STRUCTURE

  1. R.C.C. Framed Structure in high Strength cement of reputed company   and TMT steel.
  2. External wall 9” thick brick masonary walls.
  3. Internal wall 4.5” thick brick masonary walls.

 

PLASTER

  1. 12-mm thick smooth plain plaster finish.
  1. Sand faced cement plaster & Architectural finish in exterior.

 

DOORS & WINDOWS

  1. MAIN DOOR: -Frame of Teak wood & T.W. decorative shutter with beading & Brass/S.S. finish fitting.
  1. OTHER DOORS: -Frame of wood & wooden shutters of laminated panels with decorative beading & brass/ S.S. finish fittings.
  1. BATH & W.C. DOORS: -Wooden Frame with Flush Door.
  1. WINDOWS: -Fully glazed aluminum window with plain glass & with MS grills.

 

FLOORING

  1. Vitrified flooring in all rooms with 4“ high skirting.
  2. Staircase in Kota Stone with MS Railing.
  1. Kota/Situ in common Area.
  1. Ceramic tile flooring & wall cladding in bath & W.C. up to 7’0 dado.

 

P.O.P.

  1. P.O.P. ceiling with mouldings in drawing room and P.O.P mouldings in all other rooms.

 

KITCHEN

  1. Black Granite Stone Platform
  2. Stainless sink.
  3. Glazed ceramic dado of 4’.

 

 

 

 

BATH & TOILETS

  1. Standard white/Grey/Ivory Sanitary wares.
  2. One water mixer in each bathroom, with water tapes in toilet, bath & kitchen.

 

TV & TELIPHONES

  1. Concealed cable & telephone wiring in drawing & bedrooms.

 

ELECTRICAL

  1. PVC Conduit Concealed Copper wiring with adequate light, fan & socket out lets in each room.
  1. Adequate Power Points in Kitchen for Microwave, Toaster, Aquagard, Mixer, Fridge etc. With one Power Point for water heater in each bathroom.
  1. AC. Point in Master Bed room and cooler points in other room.
  2. Modular switches of Standard make.
  3. Common lighting will be provided.
  4. Emergency D.G. light point in each flat.

 

D.G.SET

  1. D.G. Set with change over Switch.

 

PLUMBING/SANITARY

  1. Standard C.P. Fittings.
  2. All sewer lines in SW & CI Pipes.
  3. All water supply lines in C PVC or PPR Pipes.
  4. Standard Sanitary wares in white/Grey/ivory colour.

 

WATER SUPPLY

  1. 24-hour water supply from over head tank.
  2. Separate lines for drinking water & utility water from over head tank with provision of Sump for Collection of Corporation water.
  3. Well for utility water.
  4. Pumps sets, one each for sump & well.

 

PAINTS

  1. Plastic Paint for the interiors.
  2. Acrylic Exterior Paint for the exteriors.

 

PARKING

  1. Covered parking for one car will be provided.

 

LIFTS

  1. Six lifts of Kone/Otis make will be provided with D.G. backup for one lift.

 

PAVING

  1. Pavement Block paving  from all sides.

 

SITE

  1. Iron main gate, Compound wall  & landscaping.

 

TERATMENT

  1. Waterproofing & anti termite treatment for toilet & bath blocks.

 

Special Common Amenities

 

  1. Club House
  2. Swimming Pool in open space.
  3. Gymnasium in club house with new equipments.
  4. Guest Bedrooms for Visitors.
  5. Community Hall with Open Air Garden.
  6. Landscape on Open areas.
  7. Intercom facility for Security.
  8. Automatic Water Level Controller.
  9. Landscaping in common areas.
  10. Guard room for the security.
  11. Camera fitted in the guard room so that visitors can be viewed in the television standing at the guard room.

 

OTHERS TERMS AND CONDITIONS

 

  1. All Interior Furniture works will be started only after completion of entire work of scheme from the Concrete Developers and in any case no work can be done by the purchaser during the completion of the building by M/s. Concrete Developers.  
  2. If there are any changes in internal arrangement then the purchaser has to give the layout plan well in advance and once the layout is finalized then the Concrete Developers shall not make any changes in the internal layout.  It is specifically agreed by the purchaser that there will be not any change in the exterior of the building.
  3. The purchaser will discuss with M/s. Concrete Developers before appointment of the interior designer.
  4. M/s. Concrete Developers will not make any changes in the toilet layout.
  1. Installments are to be paid within 15 days from the date of communication of the stage.
  1. For delayed payment 24% Interest (per annum) on the defaulted installment will be charged.  The maximum time limit for such delayed payments will be 60 days, after that booking will be cancelled and 50% of the received amount will be forfeited as penalty.
  1. All expenses with report to the preparation of all documents payment of stamp duty; Registration fee along with other expenditure payable thereon shall be born by flat purchaser.
  2. Loan facility will be available from the Financing agencies depending on the income of members and builder will be supply necessary document for loan purpose.
  3. Amount to be paid for deposit against Electric Meter, sub station network, and Water Meter, VAT, & Service Tax etc., shall be paid by the Purchaser.
  4. Any extra work done shall be charged extra.

 

MANNER OF PAYMENT      

  1. The 1st  Installment payable on completion of                 

Basement floor                                            5% OF AGREED CONSIDERATON

  1. The 2nd  Installment payable on completion of                 

     R.C.C. upto Ground floor Slab                5% OF AGREED CONSIDERATON

  1. The 3rd  Installment payable on completion of                 

     R.C.C. upto First floor Slab                            5% OF AGREED CONSIDERATON

4) The 4th Installment payable on completion of                 

     R.C.C upto Second Floor Slab                            5% OF AGREED CONSIDERATON

5)  The 5th Installment payable on completion of                         

     R.C.C. upto Third Floor Slab                     5% OF AGREED CONSIDERATON

6) The 6th Installment payable on completion of

     R.C.C. upto Fourth Floor Slab                 5% OF AGREED CONSIDERATON

7) The 7th Installment payable on completion of

     R.C.C. upto Fifth Floor Slab                             5% OF AGREED CONSIDERATON

8) The 8th Installment payable on completion of

     R.C.C. upto Sixth Floor Slab                 5% OF AGREED CONSIDERATON

9) The 9th Installment payable on completion of

     R.C.C. upto Seventh Floor Slab                            5% OF AGREED CONSIDERATON

10) The 10th  Installment payable on completion of

     R.C.C. upto Eighth Floor Slab                            5% OF AGREED CONSIDERATON

11) The 11th  Installment payable on completion of

     R.C.C. upto Ninenth Floor Slab                          5% OF AGREED CONSIDERATON

12) The 12th  Installment payable on completion of

     R.C.C. upto Tenth Floor Slab                           5% OF AGREED CONSIDERATON

13) The 13th  Installment payable on completion of

     R.C.C. upto Eleventh Floor Slab                           5% OF AGREED CONSIDERATON

14) The 14th  Installment payable on completion of

     R.C.C. upto Twelveth Floor Slab                             5% OF AGREED CONSIDERATON

15) The 15th  Installment payable on completion of

     R.C.C. upto Thirteenth Floor Slab                5% OF AGREED CONSIDERATON

16) The 16th  Installment payable on completion of

     R.C.C. upto Fourteenth Floor Slab                6% OF AGREED CONSIDERATON

17) The 17th Installment payable on completion of

     Brick Work of the APARTMENT Chosen                    6% OF AGREED CONSIDERATON

18) The 18th  Installment payable on completion                

     of Plastering work.                                6% OF AGREED CONSIDERATON

19) The 19th Installment payable on completion

      of Finishing work.                                             6% OF AGREED CONSIDERATON

20) POSSESSION / SALE DEED                          1% OF AGREED CONSIDERATON        

 

Note:- All the plans, drawings, amenities, facilities, etc. are subject to the approval of the respective authorities and would be changed if necessary. The discretion remains with the Concrete Developers. All rendering and maps are artist’s conception and not actual depiction of the Building, Walls, Driveway or Landscaping.  M/s. Concrete Developers reserve the rights to make changes at any time without notice or obligation to the information contained in this Brochure including and without limitation to the area, amenities and specifications.  M/s. Concrete Developers does not warrant any legal liabilities or responsibility for the accuracy, completeness or usefulness of any information disclosed.


 

 









  |  
  |  
  |  
  |  
  |  
  |  
Find us on :
Copyright 2007 Concret Devlopers - All rights reserved Privacy Policy & Terms of Usage  |  Design & Developed By Sanpills